Alliant Energy is based at Unit 214 Northlight Industries, Pendle Road, Brierfield, Nelson BB9 5FL — and every battery storage installation is carried out by our in-house MCS Certified NAP-84124 electrical engineers, not subcontracted. We hold MCS certification, TrustMark, NICEIC and NAPIT dual-body electrical accreditation, and ISO 9001, 14001 and 45001 management systems.
All installations comply with BS 7671:2018 (18th Edition IET Wiring Regulations) and the relevant battery storage commissioning standards. After installation, your MCS-registered installer issues your MCS certificate — required for SEG tariff registration and confirmation. We configure the Levelise hub to your tariff, set your emergency reserve, and walk you through the monitoring app before we leave.
We cover Nelson, Burnley, Blackburn, Preston, Manchester, and 21 further towns across Lancashire, Greater Manchester, Merseyside and Cheshire. See all North West locations.
Real projects with battery storage: Shepherd Distribution — 62kW Sunsynk battery rack, payback 2.9 years · Harrison Family Burnley terrace — 10kWh battery, near grid-independent Victorian terrace.