How big is the solar system installed at North West 4-Bed Semi-Detached?
Alliant Energy installed a 5kWp solar PV system using 12 panels paired with a Hybrid 5kW inverter and 10kWh of battery storage. The installation took 2 days from arrival on site to commissioning.

