Established 1877. 19.68kW flat-roof system with ballast mounts.

Project overview

Established in 1877, Pinder Brothers are a family business who manufacture fine pewter and silverware. A 19.68kW system with 48 panels and a Solis inverter was laid on an east/west split flat roof using a flat roof mounting kit with ballast.

The challenge

Like most pewter & silverware manufacturing operations, Pinder Brothers faced a structural exposure to wholesale electricity prices — a cost line that doubled for many UK businesses between 2021 and 2023 and shows no sign of returning to pre-crisis levels. With significant daytime load and suitable roof space, on-site generation was the obvious lever, but the project needed to stand on its own commercial merits: predictable payback, manufacturer-backed warranties, and zero operational disruption during install.

The solution Alliant Energy designed

Following a structural roof survey and DNO capacity check, Alliant Energy specified a 19.7kW array using 48 high-efficiency mono-PERC panels, paired with a Solis hybrid inverter. The Solis platform was chosen for its export-management capability and remote firmware updates, allowing the array to be tuned over its life without site visits. Surplus generation is exported to the grid under a Smart Export Guarantee tariff, providing a secondary revenue stream alongside the primary saving on imported electricity.

Install & commissioning

The full installation completed in 3 days, scheduled around the customer's operating hours to avoid downtime. Work was carried out by Alliant Energy's directly employed Experienced engineers — no subcontracted labour. The system was commissioned to G99 requirements, registered with the Microgeneration Certification Scheme, and handed over with monitoring access, electrical certification, and structural sign-off documents on the day of completion.

Financial outcome

In its first full year of operation the system is on track to save Pinder Brothers approximately £3,700 on electricity costs, with a payback term of 5 Years and a projected total ROI of 863%. Over the 25-year warranted life of the panels, the cumulative saving is forecast at £200,000 — a figure that improves materially if grid prices continue their long-term upward trend, and that benefits from the UK's 100% full-expensing capital allowance for qualifying solar assets.

Environmental impact

The installation displaces roughly 4.8 Tonnes of CO₂ emissions every year compared with grid-sourced electricity. Over the system's 25-year design life that is the equivalent of removing more than Pinder Brothers's entire annual Scope 2 footprint several times over — a material data point for ESG, B-Corp and net-zero reporting frameworks.

Why it matters for the pewter & silverware manufacturing sector

Pewter & Silverware Manufacturing businesses typically run daytime electrical loads — refrigeration, machinery, IT, lighting, compressors — that overlap closely with solar generation. That overlap is what drives strong economics: every unit generated and consumed on-site replaces a unit that would otherwise be bought from the grid at full commercial rates. The Pinder Brothers project demonstrates how the model scales for this kind of operation.

System
19.7kW
Panels
48
Inverter
Solis
Install
3 Days

Project FAQ

How big is the solar system installed at Pinder Brothers?

Alliant Energy installed a 19.7kW solar PV system using 48 panels paired with a Solis inverter. The installation took 3 days from arrival on site to commissioning.

How much does Pinder Brothers save each year?

Pinder Brothers saves approximately £3,700 per year on electricity, with projected lifetime savings of £200,000 over the system's 25-year guaranteed performance period. The payback term is 5 Years, delivering a total ROI of 863%.

Was the project funded or paid for upfront?

Yes — this project was delivered with funding support (grant or asset finance). Alliant Energy helps eligible UK businesses access capital allowances under full expensing, asset-finance facilities, and Power Purchase Agreements (PPAs) so solar can be installed with little or no upfront cost.

What's the environmental impact?

The system avoids around 4.8 Tonnes of CO₂ emissions every year compared with grid-sourced electricity. Over a 25-year design life that's a material contribution toward Scope 2 reduction and any ESG or net-zero reporting commitments the business holds.

Could a similar system work for my business?

Probably — the same hardware platform (panels, hybrid inverter, optional battery) scales from roughly 10kW up to 1MW+. The deciding factors are roof area, daytime electricity use, current unit rate, and grid-connection capacity. Alliant Energy carries out a free desktop feasibility study and follow-up site survey before quoting.

More projects

Three ways to get started

Ready to find out what solar saves you?

Get a tailored quote in one working day. No obligation. No hard sell. Speak to a renewable energy engineer — not a salesperson — at a time that suits you.

Quality you can trust

Insured. Guaranteed. Local.

We pride ourselves on delivering high-quality renewable energy solutions. Our experienced installers ensure every system is fitted to the highest standards, backed by a 25-year performance warranty and fully insured installations for total peace of mind.

Fully Insured25-Year WarrantyExperienced InstallersFree 24-Hour Quotes