Project overview

We’ve installed a 236.56 kWp system for Sandal Wakefield BMW, the system provided will generate nearly 200,000kWh of energy a year, reducing their dependency on grid supplied energy by nearly 30%. The Solar PV system we have had fitted here at Sandal Wakefield BMW is a long-term investment that will not only help us reduce our CO2 emissions, it will also help in our pledge to become a net-zero operation as we move towards the government’s target of carbon-neutral by 2050. The team at Alliant Energy have been great in guiding us through the process and we are looking forward to generating our own clean electricity.

The challenge

Like most automotive retail operations, Sandal Wakefield BMW faced a structural exposure to wholesale electricity prices — a cost line that doubled for many UK businesses between 2021 and 2023 and shows no sign of returning to pre-crisis levels. With significant daytime load and suitable roof space, on-site generation was the obvious lever, but the project needed to stand on its own commercial merits: predictable payback, manufacturer-backed warranties, and zero operational disruption during install.

The solution Alliant Energy designed

Following a structural roof survey and DNO capacity check, Alliant Energy specified a 236.57kWp array using 538 high-efficiency mono-PERC panels, paired with a SolarEdge hybrid inverter. The SolarEdge platform was chosen for its export-management capability and remote firmware updates, allowing the array to be tuned over its life without site visits. Surplus generation is exported to the grid under a Smart Export Guarantee tariff, providing a secondary revenue stream alongside the primary saving on imported electricity.

Install & commissioning

The full installation completed in 3 weeks, scheduled around the customer's operating hours to avoid downtime. Work was carried out by Alliant Energy's directly employed MCS-registered engineers — no subcontracted labour. The system was commissioned to G99 requirements, registered with the Microgeneration Certification Scheme, and handed over with monitoring access, electrical certification, and structural sign-off documents on the day of completion.

Financial outcome

In its first full year of operation the system is on track to save Sandal Wakefield BMW approximately £65,146 on electricity costs, with a payback term of 3.8 Years and a projected total ROI of 658%. Over the 25-year warranted life of the panels, the cumulative saving is forecast at £1.55M — a figure that improves materially if grid prices continue their long-term upward trend, and that benefits from the UK's 100% full-expensing capital allowance for qualifying solar assets.

Environmental impact

The installation displaces roughly 37.8 Tonnes of CO₂ emissions every year compared with grid-sourced electricity. Over the system's 25-year design life that is the equivalent of removing more than Sandal Wakefield BMW's entire annual Scope 2 footprint several times over — a material data point for ESG, B-Corp and net-zero reporting frameworks.

Why it matters for the automotive retail sector

Automotive Retail businesses typically run daytime electrical loads — refrigeration, machinery, IT, lighting, compressors — that overlap closely with solar generation. That overlap is what drives strong economics: every unit generated and consumed on-site replaces a unit that would otherwise be bought from the grid at full commercial rates. The Sandal Wakefield BMW project demonstrates how the model scales for this kind of operation.

System
236.57kWp
Panels
538
Inverter
SolarEdge
Install
3 Weeks

Project FAQ

How big is the solar system installed at Sandal Wakefield BMW?

Alliant Energy installed a 236.57kWp solar PV system using 538 panels paired with a SolarEdge inverter. The installation took 3 weeks from arrival on site to commissioning.

How much does Sandal Wakefield BMW save each year?

Sandal Wakefield BMW saves approximately £65,146 per year on electricity, with projected lifetime savings of £1.55M over the system's 25-year guaranteed performance period. The payback term is 3.8 Years, delivering a total ROI of 658%.

Was the project funded or paid for upfront?

This project was paid for directly by the customer. Under the UK's full-expensing capital allowance, the entire cost can be deducted from corporation tax in year one — improving the effective payback meaningfully for profitable companies.

What's the environmental impact?

The system avoids around 37.8 Tonnes of CO₂ emissions every year compared with grid-sourced electricity. Over a 25-year design life that's a material contribution toward Scope 2 reduction and any ESG or net-zero reporting commitments the business holds.

Could a similar system work for my business?

Probably — the same hardware platform (panels, hybrid inverter, optional battery) scales from roughly 10kW up to 1MW+. The deciding factors are roof area, daytime electricity use, current unit rate, and grid-connection capacity. Alliant Energy carries out a free desktop feasibility study and follow-up site survey before quoting.

More projects

Frozen Dessert Distribution

Tropical Ices
£13,700/yr · 5 Years payback

Pewter & Silverware Manufacturing

Pinder Brothers
£3,700/yr · 5 Years payback

Logistics & Haulage

Shepherd Distribution
£22,389/yr · 2.9 Years payback

Retail Technology

Datascan Retail Systems
£3,457/yr · 5.9 Years payback

Three ways to get started

Ready to find out what solar saves you?

Get a tailored quote in one working day. No obligation. No hard sell. Speak to a renewable energy engineer — not a salesperson — at a time that suits you.

Accreditations

Certified, registered, and insured. Every time.

MCS certification isn't a box-ticking exercise — it qualifies your system for Smart Export Guarantee payments and government grants. Our installers are also NICEIC-approved and TrustMark-registered, and every install is fully insured.

Citation ISO Certification: ISO 9001 quality management, ISO 14001 environmental management and ISO 45001 occupational health and safety
Get a Brochure Get a Quote Chat with AI