Dunham Forest Golf Club solar installation
All case studies

Leisure & Sport

Dunham Forest Golf Club

59.25kWp system saving £13,707 a year for Dunham Forest Golf Club.

Previous
DoubleTree by Hilton
Next
EMS Healthcare

Project overview

We installed a discreet 59kWp system over two locations at this prestigious golf venue, ensuring the installation didn’t impact the visual front of the building. Dunham Forest Golf & Country Club were looking to become more sustainable whilst protecting their club against fluctuating energy costs. Having recently installed a new Health and Fitness centre, costs had already risen for the club. This is where Alliant Energy were able to assist with a fully funded Solar PV system. The installation is carefully positioned across the main clubhouse and on the roof of the health and fitness centre, ensuring front-of-house visual appeal is retained. The installed system uses the latest SolarEdge technology, maximising generation and safety. This system now comfortably produces around 30% of the Club’s annual energy requirement whilst reducing its annual carbon footprint by over 13 tons!

The challenge

Like most leisure & sport operations, Dunham Forest Golf Club faced a structural exposure to wholesale electricity prices — a cost line that doubled for many UK businesses between 2021 and 2023 and shows no sign of returning to pre-crisis levels. With significant daytime load and suitable roof space, on-site generation was the obvious lever, but the project needed to stand on its own commercial merits: predictable payback, manufacturer-backed warranties, and zero operational disruption during install.

The solution Alliant Energy designed

Following a structural roof survey and DNO capacity check, Alliant Energy specified a 59.25kWp array using 135 high-efficiency mono-PERC panels, paired with a SolarEdge hybrid inverter. The SolarEdge platform was chosen for its export-management capability and remote firmware updates, allowing the array to be tuned over its life without site visits. Surplus generation is exported to the grid under a Smart Export Guarantee tariff, providing a secondary revenue stream alongside the primary saving on imported electricity.

Install & commissioning

The full installation completed in 1 week, scheduled around the customer's operating hours to avoid downtime. Work was carried out by Alliant Energy's directly employed MCS-registered engineers — no subcontracted labour. The system was commissioned to G99 requirements, registered with the Microgeneration Certification Scheme, and handed over with monitoring access, electrical certification, and structural sign-off documents on the day of completion.

Financial outcome

In its first full year of operation the system is on track to save Dunham Forest Golf Club approximately £13,707 on electricity costs, with a payback term of 6 Years and a projected total ROI of 417%. Over the 25-year warranted life of the panels, the cumulative saving is forecast at £411,228 — a figure that improves materially if grid prices continue their long-term upward trend, and that benefits from the UK's 100% full-expensing capital allowance for qualifying solar assets.

Environmental impact

The installation displaces roughly 11.2 Tonnes of CO₂ emissions every year compared with grid-sourced electricity. Over the system's 25-year design life that is the equivalent of removing more than Dunham Forest Golf Club's entire annual Scope 2 footprint several times over — a material data point for ESG, B-Corp and net-zero reporting frameworks.

Why it matters for the leisure & sport sector

Leisure & Sport businesses typically run daytime electrical loads — refrigeration, machinery, IT, lighting, compressors — that overlap closely with solar generation. That overlap is what drives strong economics: every unit generated and consumed on-site replaces a unit that would otherwise be bought from the grid at full commercial rates. The Dunham Forest Golf Club project demonstrates how the model scales for this kind of operation.

System
59.25kWp
Panels
135
Inverter
SolarEdge
Install
1 Week

Project FAQ

How big is the solar system installed at Dunham Forest Golf Club?

Alliant Energy installed a 59.25kWp solar PV system using 135 panels paired with a SolarEdge inverter. The installation took 1 week from arrival on site to commissioning.

How much does Dunham Forest Golf Club save each year?

Dunham Forest Golf Club saves approximately £13,707 per year on electricity, with projected lifetime savings of £411,228 over the system's 25-year guaranteed performance period. The payback term is 6 Years, delivering a total ROI of 417%.

Was the project funded or paid for upfront?

This project was paid for directly by the customer. Under the UK's full-expensing capital allowance, the entire cost can be deducted from corporation tax in year one — improving the effective payback meaningfully for profitable companies.

What's the environmental impact?

The system avoids around 11.2 Tonnes of CO₂ emissions every year compared with grid-sourced electricity. Over a 25-year design life that's a material contribution toward Scope 2 reduction and any ESG or net-zero reporting commitments the business holds.

Could a similar system work for my business?

Probably — the same hardware platform (panels, hybrid inverter, optional battery) scales from roughly 10kW up to 1MW+. The deciding factors are roof area, daytime electricity use, current unit rate, and grid-connection capacity. Alliant Energy carries out a free desktop feasibility study and follow-up site survey before quoting.

More projects

Frozen Dessert Distribution

Tropical Ices
£13,700/yr · 5 Years payback

Pewter & Silverware Manufacturing

Pinder Brothers
£3,700/yr · 5 Years payback

Logistics & Haulage

Shepherd Distribution
£22,389/yr · 2.9 Years payback

Retail Technology

Datascan Retail Systems
£3,457/yr · 5.9 Years payback

Three ways to get started

Ready to find out what solar saves you?

Get a tailored quote in one working day. No obligation. No hard sell. Speak to a renewable energy engineer — not a salesperson — at a time that suits you.

Accreditations

Certified, registered, and insured. Every time.

MCS certification isn't a box-ticking exercise — it qualifies your system for Smart Export Guarantee payments and government grants. Our installers are also NICEIC-approved and TrustMark-registered, and every install is fully insured.

Citation ISO Certification: ISO 9001 quality management, ISO 14001 environmental management and ISO 45001 occupational health and safety
Get a Brochure Get a Quote Chat with AI