Alliant Energy — Renewable Energy Solutions
01282 501589Get a heat pump quote →
Heat pumps · Bury

Heat Pump Installers in Bury

Alliant Energy installs MCS-certified air source heat pumps across Bury, including Prestwich, Whitefield, Radcliffe, Ramsbottom. We apply for the £7,500 Boiler Upgrade Scheme for you and deduct it from your invoice. 145 Bury homes have already claimed it.

By Alliant Energy Team· reviewed by MCS Registered EngineerLast updated
145
BUS grants paid in Bury
18.0
Per 10,000 homes
45%
Homes at EPC C or above
£7,500
BUS grant
  • MCS Certified
  • TrustMark
  • NAPIT
  • NICEIC Approved
  • 5-Year Workmanship WarrantyAlliant's own guarantee on the quality of our installation and labour — separate from, and in addition to, the manufacturer's product and performance warranties (up to 30 years on solar panels), which cover the equipment itself.

*The 5-Year Workmanship Warranty covers Alliant's own installation and labour — distinct from the manufacturer's product and performance warranties (up to 30 years on panels), which cover the equipment itself.

Looking for heat pump installers in Bury? Alliant Energy fits MCS-certified air source heat pumps across Bury for £8,000–£15,000 before grants. 145 local homes have claimed the £7,500 Boiler Upgrade Scheme grant, and we handle the application for you.

Key takeaways for Bury

  • 145 Boiler Upgrade Scheme heat pump grants were paid in Bury from May 2022 to June 2026: 18 per 10,000 households, 3rd of 10 Greater Manchester boroughs (DESNZ/Ofgem).
  • 59 grants were paid in 2025/26, up 48% on the year before.
  • 83.1% of Bury households heat with mains gas only, the heating most BUS heat pumps replace (Census 2021).
  • 44.9% of Bury homes are EPC band C or above (9th in Greater Manchester; England 53.3%), but only 23.5% of pre-1929 homes are (ONS).
  • The typical installed cost is £8,000–£15,000. The national BUS median is £12,908, leaving about £5,400 after the grant.

How much does a heat pump cost in Bury?

A fully installed air source heat pump in Bury typically costs £8,000–£15,000 before grants. That is in line with Ofgem's national BUS median of £12,908 for April–June 2026. After the £7,500 grant, most Bury homeowners pay £500–£7,500.

Property type Typical installed cost before grant After £7,500 BUS grant
2-bed terrace or flat £7,000–£10,000 £0–£2,500
3-bed semi-detached £9,000–£13,000 £1,500–£5,500
4-bed detached £11,000–£15,000 £3,500–£7,500
Oil-heated home (£9,000 BUS rate) £11,000–£15,000 £2,000–£6,000

Bury's mix of 38.6% semis, 28.3% terraces and 18.8% detached homes spans the whole table. A new hot water cylinder, radiator upgrades or electrical work are quoted separately after survey. Our heat pump installation page lists every extra.

Are Bury homes suitable for a heat pump?

Bury is the smallest borough by households but has the third-highest Boiler Upgrade Scheme take-up in Greater Manchester (18 per 10,000 households). Take-up rose 48% last financial year, from 40 to 59 grants. Only 44.9% of Bury homes are EPC band C or above, the second-lowest in the city region. In Prestwich, Whitefield and Ramsbottom semis, radiator sizing and insulation usually matter more than the heat pump itself.

Housing (Census 2021 / ONS EPC) Bury Greater Manchester England
Semi-detached 38.6% 37.9% 31.5%
Terraced 28.3% 28.5% 23.0%
Detached 18.8% 14.2% 22.9%
Flats (purpose-built) 12.1% 16.3% 17.1%
Heated by mains gas only 83.1% 78.1% 74.0%
Owner-occupied 66.9% 58.0% 61.3%
EPC band C or above 44.9% — 53.3%
Median EPC score 67 — 69

Insulation first

Bury is below the England average for EPC band C (44.9% vs 53.3%). The Boiler Upgrade Scheme requires any loft or cavity wall insulation your EPC recommends to be installed first. It also lets us fit a smaller, cheaper heat pump. See how to improve your EPC rating.

Free heat pump survey in Bury

Heat loss survey, BUS application and Warm Homes eligibility check. Free quote in one working day.

How many heat pumps have been installed in Bury?

145 Bury heat pumps were paid a Boiler Upgrade Scheme grant between May 2022 and June 2026. That is 18 per 10,000 households, above the Greater Manchester average of 15 and well below the England average of 35.2. On EPC records, heat pumps are the main heating in 0.37% of Bury homes (England: 1.38%).

Financial year BUS heat pump grants paid in Bury
2022/23 (from May 2022) 15
2023/24 14
2024/25 40
2025/26 59
145
BUS heat pump grants paid in Bury, May 2022 – June 2026
18 / 15 / 35.2
Grants per 10,000 homes: Bury / GM / England
BUS Q1.2 ÷ Census 2021 households
182
Bury households heated by oil only, eligible for the £9,000 rate

Which heat pump grants can Bury homeowners claim?

Grant Amount Relevance in Bury
Boiler Upgrade Scheme £7,500 Most homeowners. 83.1% of homes are mains-gas-only.
BUS oil-home rate £9,000 (from 21 July 2026) 182 oil-only households (Census 2021)
Warm Homes: Local Grant Up to £15,000 heating + £15,000 upgrades Owner-occupiers with EPC D–G and income under £36,000 or other qualifying routes

The BUS grant is paid to your MCS-certified installer and deducted from your invoice (Energy Saving Trust). The Warm Homes: Local Grant is a Greater Manchester-wide scheme delivered by the councils. Bury residents apply through the GMCA Retrofit Portal. More detail is in our Warm Homes Plan Greater Manchester guide and Boiler Upgrade Scheme guide.

Which parts of Bury do we cover?

We cover all of Bury: Prestwich, Whitefield, Radcliffe, Ramsbottom, Tottington, Summerseat, Unsworth, Holcombe Brook. Postcodes: BL0, BL8, BL9, M25 (Prestwich), M26 (Radcliffe), M45 (Whitefield). Alliant Energy is based in Nelson, Lancashire and travels to Bury for surveys and installations.

Neighbouring boroughs we also cover:

See all areas on our Greater Manchester heat pump installers page.

Get a free heat pump quote in Bury

Step 1 of 813%

What type of property do you live in?

MCS-registered installers 5-year workmanship warranty

Heat pump FAQs for Bury

How much does a heat pump cost in Bury?

A fully installed air source heat pump in Bury typically costs £8,000–£15,000 before grants, in line with the national BUS median of £12,908 (April–June 2026). After the £7,500 Boiler Upgrade Scheme grant, a 3-bed semi usually costs £1,500–£5,500. 38.6% of Bury homes are semi-detached.

How many heat pump grants have been paid in Bury?

145 Boiler Upgrade Scheme heat pump grants were paid in Bury between May 2022 and June 2026, including 59 in the 2025/26 financial year. That is 18 per 10,000 households, above the Greater Manchester average of 15 and below the England average of 35.2.

Is there a heat pump grant for Bury residents?

Yes. Bury homeowners can claim the £7,500 Boiler Upgrade Scheme, or £9,000 if switching from heating oil (182 Bury households were oil-only in Census 2021). Lower-income households with an EPC of D–G can apply for the Greater Manchester Warm Homes: Local Grant through the GMCA Retrofit Portal, which can fully fund a heat pump.

Are Bury homes suitable for a heat pump?

Most are. 83.1% of Bury households heat with mains gas only, which is the profile most BUS heat pumps replace. 44.9% of homes are EPC band C or above (England: 53.3%), and homes below band C may need insulation or radiator upgrades first. A heat loss survey confirms this.

Which parts of Bury do you cover?

All of it, including Prestwich, Whitefield, Radcliffe, Ramsbottom, Tottington, Summerseat, Unsworth and Holcombe Brook (postcodes BL0, BL8, BL9, M25 (Prestwich), M26 (Radcliffe), M45 (Whitefield)). Alliant Energy is based in Nelson, Lancashire and covers every Greater Manchester borough.

How long does a heat pump installation take in Bury?

Typically 2–3 days on site. The Boiler Upgrade Scheme voucher must be approved first, which usually takes 2–4 weeks, and we handle the application. Most customers go from survey to switch-on in 6–10 weeks.

Methodology and sources

Bury figures come from Boiler Upgrade Scheme redemptions by local authority (DESNZ/Ofgem, August 2026 release), Census 2021 tables TS044, TS046 and TS054 (ONS via Nomis) and EPC records to March 2025 (ONS). Per-household rates use 80,694 Bury households (Census 2021). Data checked 2026-09-27.

Three ways to get started

Ready for a heat pump in Bury?

Heat pump quote and BUS grant check in one working day. No obligation.

Accreditations

Certified, registered, and insured. Every time.

MCS certification isn't a box-ticking exercise — it qualifies your system for Smart Export Guarantee payments and government grants. Our installers are also NICEIC-approved and TrustMark-registered, and every install is fully insured.

Citation ISO Certification: ISO 9001 quality management, ISO 14001 environmental management and ISO 45001 occupational health and safety
Get a heat pump quote Call 01282 501589